RAILWAY TRACK TRACER
18INTRODUCTION
In history of railways , almost 90% of the accidents happens because of two reasons:
Train comes away from track
Track discontinuity
TRAIN COMES AWAY FROM TRACK
It means that track is not all problems but train moves out of track. This happens because Of lack of concentration of the people who works with track. For example when the nuts and bolts get loosed these sorts of problems ...
POWERGENERATION AND IRRIGATION BY USING WINDMIL
0Abstract
The past four decades has been a period in which have seen revolutionary changes happening in our countrywide, for wind energy resources development projects. Beside a huge number of small irrigation and wind power schemes, more than 3000 large and small projects of wind mill have been constructed all over the country. All structures/project harnessing water need gates for controlling the ...
Timer Based Industrial Liquid Pump Controller with User Defined Time Slots
0Abstract
This project is an innovative solution to operate a machine / motor / liquid pumps for a small duration. If a machine is to be operated for ten minutes, and should be switched off after the duration, it is too difficult and many times we forget to switch it off the system after the prescribed time.
This project provides the facility of automatic switch off after the requited time duration. ...
Transformer less Solid State Power Supply Design
1Abstract
There are several ways to convert an AC voltage at a wall receptacle into the DC voltage required by a microcontroller. Traditionally, this has been done with a transformer and rectifier circuit. There are also switching power supply solutions, however, in applications that involve providing a DC voltage to only the microcontroller and a few other low-current devices, transformer-based or ...

