Block diagram for Railway track tracer

RAILWAY TRACK TRACER

18INTRODUCTION In history of railways , almost 90% of the accidents happens because of two reasons: Train comes away from track Track discontinuity TRAIN COMES AWAY FROM TRACK It means that track is not all problems but train moves out of track. This happens because Of lack of concentration of the people who works with track.  For example when the nuts and bolts get loosed these sorts of problems ...
TOUCH ME NOT-BLOCK DIAGRAM

TOUCH ME NOT – For Playing Games-ECE Project

0ABSTRACT Everyone likes to enjoy their free time in a more effective way. It would be more interesting and joyful if we spend the time in playing games, solving puzzles etc. Touch me not is an interesting project that allows the user to upgrade his concentration and a relief providing game. This project is mainly designed as Events to be conducted at Exhibitions, Fetes etc. This project seems to be ...
1000 project ideas

Robotics & Mechatronics Automation Based Projects List-Mechanical Engineering-Electronics engineering-Electrical Engineering

1Robotics / Mechatronics / Automation Based Project List Fabrication of blow air material separator Fabrication of device for demonstration of magnetic levitation and launching Fabrication of linear motor Fabrication of motorized tricycle for children Fabrication of catapult for play war arena Fabrication of remote controlled robotic arms for medical operation purpose Fabrication of car bike combo Fabrication ...
AUTOMATED ATTENDANCE SYSTEM

AUTOMATED ATTENDANCE SYSTEM

14ABSTRACT ‘AUTOMATED ATTENDANCE SYSTEM ’ is designed to collect and manage student’s attendance records from RFID devices installed in a class rooms. Based on the verification of student identification at the entrances system, the RFID tag can be embedded in the ID card of the individual. First to activate a new session(hour)  the teacher swipes her RFID tag this marks a new attendance session ...
Powered by WordPress · Designed by Theme Junkie